Company logoMaster PremierGreen Energy
← Back to feasibility insights

industrialNovember 5, 2025

Feasibility Study Report for the Kuajok Solar PV Power Plant Project.

Technical and economic feasibility study for a 4.24 MWp off-grid solar PV and battery storage plant to provide sustainable, 24/7 electricity to 125,585 residents in Kuajok City, South Sudan.

Master Premier Green Energy

Content: The document covers several critical areas, including:

  • Introduction and Methodology: Overview of project objectives, scope, and data collection techniques.
  • Site Assessment: Detailed geographic, topographic, and soil descriptions of the Kuajok site.
  • Energy Demand: Estimation of residential, commercial, and institutional electricity needs for the city.
  • Technical Design: Solar PV sizing, battery energy storage system (BESS) specifications, system architecture, and electrical design.
  • Geological and Hydrological Assessment: Analysis of soil stability, groundwater depth, and seasonal flood risks.
  • Financial and Economic Analysis: Investment cost estimates, return on investment (ROI), payback periods, and broader economic impact on the local community.
  • Regulatory Framework: Review of South Sudan’s national electricity policies and investment legal frameworks.

Gallery

Study snapshots

Master Premier Green Energy
Master Premier Green Energy

Next Step

Ready to validate your project with a tailored feasibility report?

Share your project details and our engineering team will deliver a practical and investment-ready study.